Product Owner / Project Manager skill for MVP/MMP/MMR implementation planning
# SKILL.md
title: "project-mngt: Product Owner / Project Manager skill for MVP/MMP/MMR implementation planning"
name: project-mngt
description: Product Owner / Project Manager skill for MVP/MMP/MMR implementation planning
tags:
- sdd-workflow
- shared-architecture
custom_fields:
layer: null
artifact_type: null
architecture_approaches: [ai-agent-based, traditional-8layer]
priority: shared
development_status: active
skill_category: utility
upstream_artifacts: [BRD, PRD, REQ]
downstream_artifacts: [TASKS, Code]
project-mngt
Project Implementation Planning with MVP/MMP/MMR Methodology
Purpose
This skill teaches AI assistants how to analyze any project's requirements and create implementation plans using the MVP/MMP/MMR (Minimum Viable Product / Minimum Marketable Product / Minimum Marketable Release) methodology.
This is a METHODOLOGY skill that teaches HOW to plan, not WHAT to plan.
Use Cases
- Initial Project Planning: Analyze requirements and create structured implementation plan
- Plan Updates: Modify existing plans when requirements change while preserving completed work
- Progress Tracking: Update plans with current status and adjust remaining work
- Release Strategy: Define logical stages and atomic groups for incremental delivery
Adaptability
Works with:
- Any number of requirement documents (5 or 500)
- Different formats: BRD, PRD, User Stories, Epics, Features
- Various domains: Trading systems, web apps, APIs, infrastructure, ML/AI
- Changing requirements: Update plans without restarting completed work
ID Naming Standards
Reference: /opt/data/docs_flow_framework/ai_dev_flow/ID_NAMING_STANDARDS.md
Common ID Formats:
- Planning Documents: PLAN-NNN (e.g., PLAN-01, PLAN-02)
- Requirements: REQ-NN or REQ-NN-YY (e.g., REQ-01, REQ-01-01)
- Tasks: TASK-NNN or TASK-NNN-YY (e.g., TASK-01, TASK-01-01)
Format Rules:
- Use TYPE-NN for primary documents (three digits with leading zeros)
- Use TYPE-NN-YY for sub-items (two digits with leading zeros)
- IDs are unique within their artifact type
- Sequential numbering starts at 001
MVP/MMP/MMR Framework
Definitions (2024-2025 Best Practices)
MVP (Minimum Viable Product)
Purpose: Learning vehicle to validate core hypothesis with early adopters
Focus: Test riskiest assumptions, gather feedback, prove feasibility
Quality: Can have bugs, imperfect UX, manual processes
Goal: Answer "Can we build this?" and "Will users use it?"
Monetization: Not required - learning, not earning
Timeline: 4-12 weeks typical
MVP Success Criteria:
- Core functionality works end-to-end
- Riskiest technical assumptions validated
- User feedback collected
- Product-market fit signals observed
MMP (Minimum Marketable Product)
Purpose: First release-ready product that delivers real customer value
Focus: Market-ready quality, essential features, can be sold/deployed
Quality: Polished UX, stable, production-ready, minimal bugs
Goal: Answer "Will customers pay for this?" and "Can we support it at scale?"
Monetization: Required - ready for paying customers
Timeline: 8-20 weeks after MVP
MMP Success Criteria:
- All essential features complete
- Production-quality code and UX
- Security, performance, reliability validated
- Support processes in place
- Marketing/sales materials ready
MMR (Minimum Marketable Release)
Purpose: Incremental feature releases that enhance market appeal post-MMP
Focus: Additional features, optimizations, integrations, scale improvements
Quality: Same as MMP - production-ready, market-quality
Goal: Answer "How do we grow adoption?" and "What drives retention?"
Monetization: Drives expansion revenue, reduces churn, attracts new segments
Timeline: 2-8 weeks per release (ongoing)
MMR Success Criteria:
- Adds measurable customer value
- Maintains product quality standards
- Fits within product roadmap vision
- Data-driven prioritization
Progression Path
IDEA β MVP (validate) β MMP (launch) β MMR-1 β MMR-2 β MMR-n (grow)
β β β β β
Learn First Earn First Expand Value Stream
Quality Gates
| Stage | Testing | Documentation | UX | Performance | Security |
|---|---|---|---|---|---|
| MVP | Manual OK | Minimal | Basic | Good enough | Basic |
| MMP | Automated | Complete | Polished | Production SLA | Full audit |
| MMR | Automated | Updated | Polished | Production SLA | Continuous |
Analysis Methodology
Follow these 6 steps to create any implementation plan:
Step 1: Requirements Discovery
Objective: Catalog all requirements and understand project scope
Process:
1. Read all requirement documents (BRD, PRD, user stories)
2. Extract for each requirement:
- ID, Description, Complexity (1-5), Priority hints, Dependencies, Functional area
3. Create requirement inventory table
Output: Complete catalog of all requirements
Step 2: Dependency Mapping
Objective: Identify relationships and sequencing constraints
Dependency Types:
- Technical: Requires infrastructure/library/component
- Business: Prerequisite functionality for workflow
- Data: Requires schema/migration/data source
- Integration: Depends on external system/API
Process:
1. For each requirement, identify dependencies
2. Classify as blocking or non-blocking
3. Create dependency graph
4. Identify critical path
Output: Dependency map showing blocking relationships
Step 3: Atomic Grouping Principles
Objective: Create independently deployable, testable groups
Atomic Group Characteristics:
- Cohesive: Related functionality together
- Independent: Can be developed/tested/deployed separately
- Testable: Clear acceptance criteria
- Valuable: Delivers observable outcome
- Sized Right: 1-4 weeks of work
Grouping Techniques:
1. Functional Cohesion: Group by feature area
2. Technical Layer: Group by architectural component
3. User Journey: Group by end-to-end workflow
4. Dependency Cluster: Group tightly coupled requirements
Naming Convention: "[Component] [Action]" (e.g., "Broker Integration", "Risk Validation Framework")
Output: List of atomic groups with clear boundaries
Step 4: Stage Assignment (MVP/MMP/MMR)
Decision Framework:
MVP Assignment Criteria (must meet at least 2):
- Validates core technical feasibility
- Required for end-to-end workflow
- Tests riskiest assumption
- Generates critical user feedback
- No viable workaround exists
MMP Assignment Criteria:
- Essential for first customer/user
- Required for production deployment
- Regulatory/compliance necessity
- Security/reliability/data integrity critical
- Competitive table stakes feature
MMR Assignment Criteria:
- Enhances existing functionality
- Expands market reach or use cases
- Optimization or performance improvement
- Integration with optional systems
- Nice-to-have that drives adoption/retention
Output: Each atomic group assigned to MVP, MMP, MMR-1, MMR-2, etc.
Step 5: Priority Numbering
Priority Numbering System:
- Sequential priorities (1, 2, 3...): Must complete in order
- Parallel priorities (same number): Can execute simultaneously
Prioritization Rules:
1. Dependency-Driven: Higher priority = fewer dependencies
2. Risk-First: Address high-risk/uncertainty early
3. Value-Weighed: Balance technical dependencies with business value
4. Resource-Aware: Consider team size and skill distribution
Parallelization Check:
- No technical dependencies?
- Different code areas?
- Separate team members available?
- No shared infrastructure bottleneck?
- Integration points clearly defined?
If all yes β Assign same priority number
Output: Priority-numbered atomic groups
Step 6: Timeline Estimation
Complexity-Based Estimation:
- Complexity 1: 0.5-1 week
- Complexity 2: 1-2 weeks
- Complexity 3: 2-3 weeks
- Complexity 4: 3-4 weeks
- Complexity 5: 4-6 weeks
Buffer Management:
- Stage level: +15% buffer
- Project level: +25% buffer
Timeline Formula:
Total Time = Ξ£(Group Duration) / Parallel Tracks + Stage Buffers
Output: Gantt chart with start/end dates and milestones
Progress Tracking & Status Management
Implementation Status Categories
| Status | Symbol | Meaning | Mutability |
|---|---|---|---|
| COMPLETED | β | Fully implemented, tested, deployed | IMMUTABLE |
| IN_PROGRESS | π§ | Currently being worked on | Assess impact |
| BLOCKED | βΈοΈ | Cannot proceed due to dependency/issue | Requires resolution |
| PLANNED | π | Not yet started, future work | FREELY MODIFIABLE |
| MODIFIED | π | Changed from original plan | Document changes |
| CANCELLED | β | Removed from scope | Justify removal |
Status Tracking Requirements
- Every atomic group MUST have a status
- Completed work is IMMUTABLE - never modify in plan updates
- In-progress work requires careful impact assessment
- Only planned work can be freely rearranged
- All status changes MUST be documented in change log
Change Management Protocol
Scenario A: New Project (Initial Plan Creation)
When to Use: Starting new project, no prior plan
Inputs:
- Complete set of requirement documents
- Project context (domain, team size, constraints)
- Timeline constraints (if any)
Process:
1. Execute Steps 1-6 (Requirements Discovery through Timeline Estimation)
2. All atomic groups marked as PLANNED
3. Timeline starts from project kickoff (Week 1)
Output: PLAN-XXX_[project_name].md version 1.0
Scenario B: BRD Changes with Existing Plan (MOST CRITICAL)
When to Use: Requirements changed AND project underway
Inputs:
- Modified/new requirement documents
- Existing implementation plan
- Current progress status (which groups are complete/in-progress)
- Current date (timeline restart point)
Process (CRITICAL - Follow Exactly):
Phase 1: Preserve Completed Work (IMMUTABLE)
1. Identify all groups with status COMPLETED
2. Mark as LOCKED - do NOT modify
3. Rule: Never delete, rename, or change scope of completed work
Phase 2: Assess In-Progress Work
1. Identify groups with status IN_PROGRESS
2. Assess: Does BRD change affect scope? Should work continue?
3. Document assessment
4. Decision: Continue as-is / Adjust scope / Cancel
Phase 3: Analyze BRD Changes
1. Identify added/modified/removed requirements
2. Map changes to atomic groups
3. Determine affected groups and new groups needed
Phase 4: Replan PLANNED Work Only
1. Only modify groups with status PLANNED
2. Options: Regroup, Reprioritize, Add new, Cancel, Modify scope
3. Re-run dependency analysis
4. Re-run stage assignment
Phase 5: Update Timeline
1. Start from current date, NOT project start
2. Calculate remaining work
3. Re-estimate remaining groups
4. Update end date projection
5. Calculate timeline variance
Phase 6: Document Changes
1. Create detailed change log
2. Document BRD changes and rationale
3. List all affected groups
4. Explain timeline impact
5. Update progress summary
Output: Updated PLAN-XXX_[project_name].md (version incremented)
CRITICAL RULES:
- β
PRESERVE all completed work
- β
ASSESS impact on in-progress work
- β
ONLY modify planned work
- β
START timeline from TODAY
- β
DOCUMENT all changes
- β NEVER modify completed groups
- β NEVER restart timeline from Week 1
Scenario C: Progress Update (No BRD Changes)
When to Use: Update plan with progress, requirements unchanged
Inputs:
- Existing plan
- Progress update (status changes)
- Current date
Process:
1. Update status of groups
2. Mark completed groups with dates
3. Update progress metrics
4. Adjust timeline if pace differs
5. Identify blocked items
Output: Refreshed PLAN-XXX_[project_name].md
Execution Templates
Template: Implementation Plan Document Structure
# Implementation Plan: [Project Name]
## Document Control
| Item | Details |
|------|---------|
| **Project Name** | [Name] |
| **Plan ID** | PLAN-01 |
| **Version** | X.0 |
| **Date** | YYYY-MM-DD |
| **Status** | [Active / Completed / On Hold] |
| **Owner** | [Name] |
| **Preparer** | [Name] |
### Document Revision History
| Version | Date | Author | Changes Made | Approver |
|---------|------|--------|--------------|----------|
| 1.0 | YYYY-MM-DD | [Name] | Initial plan creation | |
| | | | | |
---
## Executive Summary
**Project Goal**: [One-sentence description]
**Implementation Approach**: MVP β MMP β MMR staged releases
**Current Status**: [X% complete, Y of Z groups done]
**Timeline**: Start: YYYY-MM-DD, Projected End: YYYY-MM-DD, Duration: X weeks
**Key Milestones**:
- MVP: [Date] - [Status]
- MMP: [Date] - [Status]
- MMR-1: [Date] - [Status]
---
## Implementation Progress Summary
*(Include in updated plans)*
**Overall Status**: X% Complete (Y of Z groups completed)
**Completed Stages**:
- MVP (Completed: YYYY-MM-DD, Duration: X weeks)
**Current Stage**: MMP Phase 2 (Week 3 of 4)
**Completed Groups**: [List with dates]
**In Progress**: [List with status]
**Planned**: [List with start dates]
**Blocked**: [List with issues]
**Modified**: [List with reasons]
**Cancelled**: [List with justification]
**Timeline Adjustment**:
- Original End: YYYY-MM-DD
- Current Projected: YYYY-MM-DD
- Variance: +/- X weeks
- Reason: [Explain]
---
## Stage 1: MVP (Minimum Viable Product)
**Goal**: [What this stage validates]
**Status**: [NOT_STARTED / IN_PROGRESS / COMPLETED]
**Duration**: [Original X weeks] | Actual: [If complete]
**Success Criteria**:
- [ ] [Criterion 1]
- [ ] [Criterion 2]
**Exit Criteria**:
- [ ] Core functionality works end-to-end
- [ ] Riskiest assumptions validated
### Atomic Groups
#### Priority 1: [Group Name]
**Status**: [COMPLETED / IN_PROGRESS / BLOCKED / PLANNED / MODIFIED / CANCELLED]
**Requirements**:
- REQ-01: [Description]
- REQ-02: [Description]
**Dependencies**:
- [Dependency 1] (Status: Satisfied / Pending)
**Deliverable**: [Clear, testable output]
**Success Criteria**:
- [ ] [Criterion]
**Duration**: X weeks
**Completion Date**: [If COMPLETED]
**Notes**: [If MODIFIED/BLOCKED/CANCELLED]
---
## Timeline Visualization
```mermaid
gantt
title Implementation Timeline
dateFormat YYYY-MM-DD
section MVP
Group 1 (β
) :done, mvp1, 2024-01-01, 2w
Group 2 (π§) :active, mvp2, 2024-01-15, 2w
Group 3 (π
) :mvp3, 2024-01-29, 1w
Change Log
(Required in updated plans)
Version 2.0 - YYYY-MM-DD
Reason for Update: [BRD changes / Progress update]
BRD Changes:
- BRD-004: Added 5 new requirements (REQ-041 to REQ-045)
Impact Analysis:
- Completed Work: Preserved as-is
- In-Progress Work: [Assessment]
- Planned Work: [Modifications]
Specific Changes:
1. Group X: MODIFIED - Added REQ-041, REQ-042
2. Group Y: NEW - Created for REQ-043, REQ-044, REQ-045
3. Group Z: CANCELLED - Requirement removed
Timeline Impact: +2 weeks due to new Group Y
Traceability Matrix
| Atomic Group | Requirements | ADRs | BDD Scenarios | Status |
|---|---|---|---|---|
| MVP Group 1 | REQ-01, REQ-02 | ADR-006 | broker.feature | β |
| MMP Group 5 | REQ-041, REQ-042 | ADR-008 | risk.feature | π§ |
---
## AI Assistant Usage Instructions
### How to Invoke This Skill
#### Scenario 1: Create Initial Implementation Plan
**Command Pattern**:
"Use the project-mgnt skill to create an implementation plan for [project name].
Inputs:
- Requirement documents: [list file paths]
- Project context: [domain, team size, constraints]
- Timeline constraint: [if any]
Create PLAN-XXX_[project_name].md following MVP/MMP/MMR methodology."
**Example**:
"Use the project-mgnt skill to create an implementation plan for inventory system.
Inputs:
- Requirements: {project_root}/docs/BRD/BRD-*.md (11 files)
- Context: E-commerce domain, 5 FTE team, staging deployment first
- Constraint: MVP in <3 months
Create PLAN-01_inventory_system.md in docs/IMPL/"
---
#### Scenario 2: Update Existing Plan (Requirements Changed)
**Command Pattern**:
"Use the project-mgnt skill to update the implementation plan at [path].
Inputs:
- Modified BRDs: [list changed files]
- Existing plan: [path]
- Current progress: [which groups complete/in-progress]
- Current date: [today]
IMPORTANT: Preserve completed work, only modify planned work."
**Example**:
"Use the project-mgnt skill to update PLAN-01_inventory_system.md.
Inputs:
- Modified: BRD-004 added 5 new security requirements
- Plan: docs/IMPL/PLAN-01_inventory_system.md v1.0
- Progress: MVP complete (Groups 1-4), Group 5 in progress (week 2/4)
- Date: 2024-02-01
Create v2.0 with change log."
---
### Expected Outputs
Every invocation MUST produce:
1. **Implementation Plan Document**
- Filename: `PLAN-XXX_[project_name].md`
- Location: User-specified or docs/IMPL/
- Format: Markdown following template
- Versioning: v1.0, v2.0, v3.0...
2. **Required Sections**
- Document Control section with project metadata and revision history
- Executive Summary
- Progress Summary (if update)
- Stage breakdown (MVP, MMP, MMR)
- Atomic groups with priorities, status, dependencies
- Timeline visualization (Gantt chart)
- Success metrics and exit criteria
- Change log (if update)
- Traceability matrix
3. **Change Log** (updates only)
- BRD changes documented
- Impact analysis
- Specific group changes
- Timeline impact
---
## Decision Frameworks
### Framework 1: MVP Scope Decisions
**Question**: Should this feature be in MVP?
**Key Questions**:
1. Does it test the core hypothesis?
2. Can we validate without it?
3. Is there a simpler alternative for MVP?
4. Does it validate high-risk assumption?
5. Is there a viable workaround?
**MVP Inclusion Criteria** (meet at least 2):
- [ ] Validates core technical feasibility
- [ ] Required for end-to-end workflow
- [ ] Tests riskiest assumption
- [ ] Generates critical user feedback
- [ ] No viable workaround exists
---
### Framework 2: Parallel vs Sequential
**Decision Checklist**:
Group A + Group B can be parallel if:
- [ ] No code dependencies
- [ ] Different files/modules
- [ ] No shared database schema changes
- [ ] No shared infrastructure
- [ ] Separate team members available
- [ ] No specialized skill bottleneck
- [ ] Integration points clearly defined
- [ ] Low rework risk
If 8-10 checks = β
PARALLEL (same priority)
If 5-7 checks = β οΈ PARALLEL with caution
If <5 checks = β SEQUENTIAL
```
Framework 3: Stage Gate Criteria
MVP β MMP Gate:
Exit Criteria (must meet ALL):
- [ ] Core functionality works end-to-end
- [ ] Riskiest assumptions validated
- [ ] User feedback collected
- [ ] Critical bugs logged
- [ ] Team consensus: hypothesis validated
- [ ] Product Owner sign-off
Proceed if:
- β
Hypothesis confirmed
- β
Technical feasibility proven
- β
Team confident
STOP if:
- β Hypothesis rejected
- β Technical infeasibility
- β Cost exceeds value
Framework 4: Update Impact Assessment
Process:
Step 1: Categorize Change
- Type: New / Modified / Removed / External dependency
- Size: Small (<5 req) / Medium (5-15) / Large (>15)
- Timing: Early (planned) / Mid (in-progress) / Late (completed)
Step 2: Map to Groups
- Completed groups: [Impact: None / Re-validation needed]
- In-progress groups: [Impact: Continue / Adjust / Stop]
- Planned groups: [Impact: Modify / Cancel / Reprioritize]
Step 3: Impact Level
- NONE: No action
- LOW: <1 week, adjust in place
- MEDIUM: 1-2 weeks, consider new group
- HIGH: >2 weeks, create new group
- CRITICAL: Invalidates group, cancel/redistribute
Step 4: Decision Matrix
- COMPLETED: No change (immutable) unless re-validation needed
- IN_PROGRESS: Continue / Adjust / Stop and replan
- PLANNED: Adjust / Modify / Cancel / Create new
Adaptation Guidelines
For Different Project Types
Infrastructure Projects
- MVP: Single environment (dev) with core infrastructure, automation scripts
- MMP: Production with full DR/HA, all IaC automated
- Grouping: By layer (network, compute, storage, security)
- Critical Path: IAM/Security β Network β Compute
API Development
- MVP: Core endpoints, happy-path only, simplified auth
- MMP: All endpoints, full error handling, OAuth, rate limiting
- Grouping: By resource/domain (Users API, Orders API)
- Parallel: Independent resources can develop simultaneously
ML/AI Systems
- MVP: Single model, manual training, sample data
- MMP: Automated pipeline, versioning, A/B testing, production serving
- Grouping: By ML pipeline stage (data prep, training, serving)
- Critical Path: Data quality β Model training β Serving
Web Applications
- MVP: Single-page prototype, core flow, desktop-only
- MMP: Responsive, cross-browser, all flows, production hosting
- Grouping: By user journey (registration, onboarding, core workflow)
- Parallel: Frontend + Backend (clear API contract)
For Changing Requirements
New Features Added Mid-Project
- Is it MVP validation? β Add to MVP (rare)
- Essential for launch? β Add to MMP
- Incremental value? β Add to MMR
- Can wait? β Backlog
Process: Create requirement IDs, assess dependencies, fit in existing or create new group, assign stage/priority, update timeline, document in change log.
Features Removed/Descoped
- In COMPLETED group? β Note descoping (already built)
- In IN_PROGRESS? β Assess if should continue or stop
- In PLANNED? β Cancel group or reduce scope
Process: Identify affected groups, remove requirements, cancel empty groups or adjust deliverables, update timeline, document rationale.
Priority Changes (Urgent Feature)
- Verify dependencies allow earlier execution
- Reprioritize to earlier priority number
- Shift other groups later
- Assess resource impact
- Update timeline
- Communicate trade-offs in change log
For Different Team Sizes
Small Team (2-3 FTE)
- Limited parallelization (max 2 tracks)
- Focus on sequence over parallel
- Longer MVP/MMP stages
- Add 30-50% buffer for context switching
Medium Team (4-8 FTE)
- Good balance (2-3 parallel tracks)
- Specialization possible
- Maximize stage parallelization
- Clear ownership
Large Team (9+ FTE)
- High parallelization (4+ tracks)
- Specialized roles
- Risk: Communication overhead, integration complexity
- Strategy: Strict API contracts, daily syncs, strong PM
Best Practices Compendium
Common Pitfalls and Solutions
Pitfall 1: MVP Scope Creep
- Problem: MVP grows with "nice-to-have" features
- Solution: Ruthlessly apply MVP criteria, time-box MVP, create "MMP Backlog"
Pitfall 2: Ignoring Dependencies
- Problem: Parallelizing groups with hidden dependencies causes rework
- Solution: Thorough dependency mapping, define APIs before parallel work, daily syncs
Pitfall 3: Modifying Completed Work
- Problem: Updates change completed groups, causing confusion
- Solution: Mark completed as IMMUTABLE, create NEW groups for modifications
Pitfall 4: Underestimating MMP Polish
- Problem: Thinking MMP is "MVP + features" vs "production quality"
- Solution: Budget 50-100% more time for MMP, use strict "Definition of Done"
Pitfall 5: No Clear Stage Gates
- Problem: Moving MVP β MMP without validating success
- Solution: Explicit gate meetings, written exit criteria, PO sign-off required
When to Deviate
Acceptable Deviations:
- Regulatory deadline: Compress stages, parallelize aggressively
- Market window: Skip some MMR features, focus on differentiators
- Technical debt crisis: Insert "Stabilization Sprint" between stages
Never Deviate:
- β Skip MVP validation
- β Launch MMP with known high-severity bugs
- β Ignore completed work in updates
- β Parallelize hard dependencies
Lessons Learned
- MVP Always Takes Longer: Add 25% buffer (50% for first-time team)
- MMP Needs More Testing: Budget 30% of MMP for testing/QA
- Documentation Never "Done": Start in MVP, update continuously
- Velocity Improves: First groups slower (learning), later groups faster (momentum)
Validation Checklist
For New Plans
Completeness:
- [ ] All requirements accounted for
- [ ] Dependencies identified and documented
- [ ] No circular dependencies
Atomic Groups:
- [ ] Groups independently testable
- [ ] Groups cohesive (related functionality)
- [ ] Size reasonable (1-4 weeks each)
- [ ] Descriptive names
Stage Assignment:
- [ ] MVP scope minimal (validation only)
- [ ] MMP includes launch essentials
- [ ] MMR is incremental (not launch-critical)
Timeline:
- [ ] Estimates based on complexity
- [ ] Buffers included at stage level
- [ ] Timeline realistic for team size
For Updated Plans (CRITICAL)
Immutability:
- [ ] All completed work preserved unchanged
- [ ] Completion dates/deliverables unchanged
- [ ] No deletions/scope changes to completed groups
Impact Assessment:
- [ ] In-progress work assessed
- [ ] Only planned work modified
- [ ] New requirements mapped to groups
Change Log:
- [ ] BRD changes documented
- [ ] Impact analysis complete
- [ ] Specific changes listed with reasons
- [ ] Timeline impact calculated
Timeline Continuity:
- [ ] Timeline starts from current date
- [ ] Remaining work calculated accurately
- [ ] Variance explained
Progress Tracking:
- [ ] Progress summary accurate
- [ ] Status categories correct
- [ ] Completion percentage calculated
Appendix
Complexity Rating Scale
| Rating | Definition | Duration |
|---|---|---|
| 1 | Trivial: Config change, minimal code | 0.5-1 week |
| 2 | Simple: Single component, clear requirements | 1-2 weeks |
| 3 | Moderate: Multiple components, some integration | 2-3 weeks |
| 4 | Complex: Cross-system integration, unknowns | 3-4 weeks |
| 5 | Very Complex: Architectural change, high uncertainty | 4-6 weeks |
Glossary
MVP: Learning-focused first version to validate hypothesis. Functional but imperfect.
MMP: Market-ready first release with essential features and production quality. Can be sold.
MMR: Incremental feature releases after MMP. Production-quality, adds value.
Atomic Group: Independently deployable set of related requirements. 1-4 weeks, cohesive, testable.
Critical Path: Longest dependency chain determining minimum timeline.
Dependency: Prerequisite relationship between requirements or groups.
Stage Gate: Decision point between stages to validate completion.
Priority Number: Sequencing indicator. Same number = parallel execution.
Status: Current state (COMPLETED, IN_PROGRESS, BLOCKED, PLANNED, MODIFIED, CANCELLED).
Change Log: Document section tracking all modifications from previous version.
Immutable: Cannot be changed. Completed work is immutable in updates.
Worked Example Reference
See examples directory for complete worked examples:
Trading System v1.0: Initial plan from 11 BRDs
- 13 atomic groups across MVP/MMP/MMR
- All groups PLANNED
- Timeline: 27 weeks from start
Trading System v2.0: Updated after BRD-004 changes
- MVP completed (Groups 1-4)
- Group 5 in progress
- New requirements added
- Timeline adjusted, change log included
(Full examples in {project_root}/.claude/skills/project-mngt/examples/)
Skill Version History
Version 1.0 (2025-01-03):
- Initial release
- Complete MVP/MMP/MMR framework
- Change management protocols
- Templates and decision frameworks
- Validation checklists
- Adaptation guidelines
Support and Feedback
For issues or enhancements:
1. Document issue or suggestion
2. Provide scenario where skill didn't work
3. Suggest improvement with rationale
This skill evolves based on real-world usage and feedback.
# Supported AI Coding Agents
This skill is compatible with the SKILL.md standard and works with all major AI coding agents:
Learn more about the SKILL.md standard and how to use these skills with your preferred AI coding agent.